Projects / Waste Water / Drainage

Assignment/Project Name: Consultancy Work for Assignment Name: Consultancy Services for Preparation of Detailed Project Reports for 24x7 water supply system, integrated Sewerage System and Storm Water Drainage system for 59 towns in Bihar- “Package – 11- Bhagalpur” with BUIDCO
 (Preparation of Detailed Project Reports for Storm water drainage System for Bhagalpur Town in Bihar- “Package – 11- Bhagalpur” with BUIDCO)
Location within Country :  Bhagalpur, Bihar, India

Name of Client :IL&FS Infrastructure Development Corporation, Bihar Urban Infrastructure Development Corporation Ltd.

Status of Project: Completed

Professional Staff Provided by Your Firm/entity(profiles):

Satya Bhanu- Structure Design Expert

Rajiv Mishra-Team Leader cum Public Health Engineering Expert,

Deepak Sharma-Water Supply Expert (Deputy Team Leader)

Sandeep Gupta- Sewerage Treatment Expert,

Chandan Kumar- Design –Civil Engineer

Subimal Paitadar (Social Expert)

Vivek Jain- (Civil Engineer)

Nisha Bhatia- Project Coordinator 

Neha Sharma – Financial Expert

Description of Scope of work:-

Government of Bihar through Bihar Urban Infrastructure Development Corporation Ltd. (BUIDCo) has mandated IL&FS IDC for preparation of Feasibility report and DPR along with Bid documents for providing basic urban infrastructure services with special reference to Water supply , Sewerage System , Storm Water system in Five towns for the design year 2046 with the base year being 2016 and midyear 2031, in order to shift the town in the fast lane towards development. These Schemes will be funded by under JNNURM. 

 

The Scope of services provided by ACEPL

Component – Design & Engineering for DPR

Reviewing existing maps, studies, and other related documentation to obtain a better understanding of the town’s Storm Water Drainage system prior to the start of fieldwork. Understanding of the existing storm drainage system and identifying the main issues including severity and location of inundation, pollution and other environmental issues of the drains, absence of drainage system or lack of connectivity in conveyance, physical constraints to flow in the drains viz. encroachments into Storm Water Drainage channels, solid waste dumping, natural and man-made obstructions, including pipe culverts and low level causeways, road and rail over bridges, flyovers, canals, permanent ways etc. Identifying appropriate planning and design parameters based on the project area situation; mainly, the appropriate design frequencies of the storms (based on degree of protection needed vs. permitted flooding, based on type of area – residential, commercial, business districts etc), the run-off coefficients, proposed method of computation, proposed channel shapes etc.,