Projects / Drinking Water

Name of Project/ Assignment: Consultancy Services for Preparation of Detailed Project Report for LWSS KOL Dam and approval from Inter-national funding Agency in Shimla

Location within Country: Shimla, Himachal Pradesh, India ( JICA Funded)

Approx. Project Cost- INR 335.76 Cr

Name of Employer: Irrigation & Public Health Engineering Department Himachal Pradesh.

Address: Executive Engineer, I&PH Division No. II, Shimla-171003, Himachal Pradesh.

Narrative Description of Project:

The proposed water Supply Project from Satluj envisages to tap water from the back waters of Kol Dam reservoir at Suni. Tapping of water from the back waters of the reservoir would solve the problem of heavy silt load in river Satluj. The net additional water requirement of 51.09 MLD is proposed to be lifted from the reservoir of KOL Dam on Satluj river.

 

  • Study of the existing DPR.
  • Preparation of DPR for final submission to JNNURM and International Funding agency.
  • Detailed technical design of Intake, WTP and rising main including BOQ, Technical assistance to IPHE for getting approval from JNNURM and International Funding agency.

Status of Project: Completed

Professional Staff Provided by Your Firm/entity(profiles):

  • Deepak Sharma (Water Supply Expert)
  • Satyabhanu Agirash (Design Expert)
  • Anil Kumar (Civil Engineer)
  • Chandan Kumar (Civil Engineer)
  • Ankur Gupta (Project Manager)
  • Nisha Bhatia (Project Coordinator)

Description of Actual Services Provided by Your Staff:

  • Study of the existing DPR.
  • Preparation of DPR for final submission to JNNURM and International Funding agency.
  • Detailed technical design of Intake, WTP and rising main including BOQ.
  • Technical assistance to IPHE for getting approval from JNNURM and International Funding agency.