Projects / Drinking Water

Assignment/Project Name:  Consultancy services including detailed topographical Survey, Hydraulic design of water supply scheme and Structural design of OHT and design of other allied works for Construction of Water Supply Scheme based on piped Ground Water Supply Schemes (370) in District -Kaushambhi under Praygraj Mandal and relevant works Including Commissioning and Operation & Maintenance of all schemes for 10 Years under Jal Jeevan Mission, Uttar Pradesh – (Design Management and Supervision Consultant)
Location within Country :  Sanjay Nagar- Ghaziabad-Uttar Pradesh

 Name of Client: Baba Construction Pvt. Ltd. (BABA)- Jal Jeevan Mission, Uttar Pradesh
Address: A-20, HIG Dupex, Sector-23, Sanjay Nagar, Ghaziabad- UP

Status of Project: ongoing

Professional Staff Provided by Your Firm/entity(profiles):

Team Leader- Deepak Sharma 

Structure Design Engineer (DTL) – Satyabhanu

Electrical Expert – R.C. Sharma – Amit Soni

Mechanical Expert – Mukesh Soni, 

Project Engineer- Taniya, Anjali, Naveen, Sanjay, Sushant sharma 

Description of Project:

  • Ground water Piped water supply Scheme: – OHTS, Tube wells, Rising & Distribution
  • network, staff Quarters and appurtenant works. Nos of villages may vary after
  • regrouping/rezoning of village / Single/multiple GPS of villages while design of Scheme

 

Scope of Services: Census data from SWSM / relevant dept. of last since 30 yrs. for calculation of water demand. Design basis like Population forecast method, Demand water supply per capita, command area of OHT, minimum & maximum pressure in pipe line , identification of MOC of pipe in rocky area or any relevant data which would be needed for the DPR preparation, Survey work – Topographical survey including contour for Rising main , distribution pipe & distribution line with in village along with Location of OHT/PUMP House/Staff Quarter/ Solar PV panel /central monitoring SCADA control room/ master control room/ nearest electricity line for power supply or any other relevant required data as per tender, Hydrogeological survey/ VES/ ERT / geophysical survey for ground water yield cum sustainability for tube well including pumping capacity calculation or any other relevant required data will be considered by DPR consultant, Soil investigation for SBC at OHT, staff Quarter & Pump House design & drawing. Number of borehole samples as required for SBC, 10-15 m depth/ necessary required depth will be organized by DPR consultant, DPR preparation, submission & it’s approval – detailed design & drawings ,BOQ , specification & data sheet ( as good for RFQ as per contract ) for civil work, pipes , mechanical , E&I ,SCADA , Solar system and  other relevant data as per RFP  provided, Solar PV panels for pumps wherever applicable. Identification of strategic location of central monitoring SCADA control room/ master control room.