Projects / Infrastructure Planning and Design

Assignment/Project Name: Consultancy Services for preparation of DPR for Urban Water Supply and Sewerage / Septage Management, Rejuvenation of Water Bodies and Development of Green Spaces Under JJM(U) Amrut-2 “DPR Consultant for UADD, Government of Madhya Pradesh” 21 ULBs of Various location of Indore and Ujjain in Bhopal – Madhya Pradesh)

Location within Country:  Indore and Ujjain-, Madhya Pradesh, India

 Name of Client: Directorate, Urban Administration & Development MP, Bhopal

 

Status of Project: Ongoing Professional Staff Provided by Your Firm/entity(profiles):

Team Leader- Deepak Sharma 

Dy. Team Leader cum Design Expert- Santya Bhanu Angirash             

PHE Expert- M. K. Singh

Urban Planner- Nancy Gupta , Urban Planner- Deepak Sharma

Project Engineer- Dhirender Kumar Choudhary, Project Engineer- Devender Singhal , Project Engineer: Prashant Puddhar, Project Engineer: Umesh Dharmati, Environment Engineer- Devender Goyal 

Project coordinator- Aman Sharma

Project Manager-Ravinder Singh Sisodia, Engineer-Aman Sharma

Description of Scope of work: –

  • The Team Leader and the respective specialist will collect and review the
  • following data, records and studies:
  • Previous studies for surface source of water
  • Previous studies of hydro-geological survey
  • Topo sheets of the project area
  • Relevant regulations, rules and legislation for water supply
  • Maps showing the existing facilities for development area :- Water supply, To prepare an inventory of available data and information and check the sufficiency / adequacy of the data for evaluating the existing services and assessing the options available for improvements.
  • Collection and review of available reports, documents, data, maps etc.
  • Carrying out a reconnaissance survey of the project area in respect of the existing services of water supply (treatment and distribution) land use plan, roads and pathways project area.
  • Review and analysis of the concept plan for water supply system, Examination of alternatives and recommending options for improvement of water supply in project area Cost Estimation and DPR preparation.