Assignment/Project Name: Consultancy Services for carrying out Hydraulic Modelling and Preparation of Detailed Project Report (DPR) for creation of DMAs and ultimately reduce of NRW for improvement in consumer service level under the command area of primary Underground Reservoirs (UGRs) in Delhi SE(North-East) Package – 2.

Client: Delhi Jal Board – NE- II,

Project Cost: INR. 1398.11Cr.

Description of Scope of Work: The objective of the consultancy is to analyze the existing water supply network, Designing of peripheral water lines emanating from under construction UGR & BPS North East area of Delhi to prepare detailed designing based report on present and projected population for equitable distribution of water at adequate pressure and quality, Cost estimation. The main objective is to implement a NRW strategy, Leak deduction, DMA formation and rehabilitation of existing pumps, sustainable & equitable water supply infrastructure on SCADA base. Water supply-Rehabilitation of existing WTP, UGR, Pumps, Distribution, Hydraulic Modeling