Project

                                                                                                                                                                                                                                                             
Consultancy Services for Detailed Design including Technical Specification, BOQ, Good for Construction ( GFC) drawings for Grading , Drainage & Storm Water System for Industrial development Near Habshan South in Abu Dabhi (UAE) .
Consultancy Services for Preparation of DPR for LWSS KOL Dam and approval from International funding Agency. Irrigation & Public Health Engineering Department Shimla

Assignment Name:

Consultancy Services for Preparation of Detailed Project Report for LWSS KOL Dam and approval from International funding Agency in Shimla

Approx. value of the Work: : INR- INR-395 Crores

Duration of Assignment (months): 3 Months

Water Supply: Shimla, Himachal Pradesh India

Name of Client:Irrigation & Public Health Engineering Department Himachal Pradesh

Start date
January: 2014

Completion date:
Ongoing

Name of senior professional staff of your firm involved and functions performed:

  • Mr. Deepak Sharma ( Water & Waste water Expert
  • Mr. Anil kumar ( Civil Engineer)
  • Mr. Ankur Gupta ( Project Manger )

Narrative description of Project: -
The proposed water Supply Project from Satluj envisages to tap water from the back waters of Kol Dam reservoir at Suni. Tapping of water from the back waters of the reservoir would solve the problem of heavy silt load in river Satluj. The net additional water requirement of 51.09 MLD is proposed to be lifted from the reservoir of KOL Dam on Satluj river.

  • Study of the existing DPR
  • Preparation of DPR for final submission to JNNURM and International Funding agency.
  • Detailed technical design of Intake, WTP and rising main including BOQ
  • Technical assistance to IPHE for getting approval from JNNURM and International funding agency.

Scope of Work: -

  • Study of the existing DPR
  • Preparation of DPR for final submission to JNNURM and International Funding agency
  • Detailed technical design of Intake, WTP and rising main including BOQ
  • Technical assistance to IPHE for getting approval from JNNURM and International Funding agency

Consultancy Services for the Rehabilitation of Existing 6 Nos. of Sewage Treatment Plants in Shimla and Technical Assistance in improvement in Operation and Maintenance. Irrigation & Public Health Engineering Department Shimla

Assignment Name:

Consultancy Services for the Rehabilitation of Existing 6 Nos. of Sewage Treatment Plants in Shimla and Technical Assistance in improvement in Operation and Maintenance. In Shimla

Approx. value of the Work: : INR- INR-250 Crores

Duration of Assignment (months): 3 Months

Location: Shimla, Himachal Pradesh India

Name of Client: Irrigation & Public Health Engineering Department Himachal Pradesh

Start date
February: 2014

Completion date:
Ongoing

Name of senior professional staff of your firm involved and functions performed:

  • Mr. Deepak Sharma ( Waste water Expert
  • Mr. Anil kumar ( Civil Engineer)
  • Mr. S. B. Rao ( USB Expert)
  • Mr. Ashok Kumar ( ST Design Engineer)
  • Mr. Ankur Gupta ( Project Manger )

Narrative description of Project: -
The Shimla Sewerage Project was executed under OPEC aided fund during the year 1998-2003 and following six nos.
STPs were constructed under the project with network in six zones:

  • STP Lal Pani - 19.35 MLD
  • STP DHalli - 0.76 MLD
  • STP Summer Hill - 3.93 MLD
  • STP North Disposal - 5.80 MLD
  • STP Snowdon - 1.35 MLD
  • STP SanjaulyMalyana - 4.40 MLD

UASB technology has been adopted in case of 19.35 MLD STP and in rest of 5 nos. STPs, extended aeration followed by tertiary treatment by Clarifloculator have been followed. Filter press for removing the excess sludge has been provided for releasing the effluent in the natural bodies. O&M of STPs has been outsourced to private contractors. The performance of the STPs operated by contractors is not up to the mark and department is facing operational difficulties in the functioning of these STPs. Department intends to engage consultant for improving the performance and overseeing these STPs for 5 years of O&M.

Scope of Work: -

  • Meeting with Clients to understand the problem faced by department and collection of available as built drawings, design, O&M manual and other details necessary for the work/study/report. Review shall entirely be based on the data made available by client. Our experts, to the best of their ability, will carry out a desktop analysis to assess the appropriateness and completeness of the data and make appropriate assumption/corrections in consultation with client for the missing gaps to complete the study.
  • To undertake site visit of all six STPs and review the various works/units for technical intactness with reference to overall sewerage project and cover civil works, electrical & mechanical equipment’s. During the site visits our experts will also conduct discussions and interviews with STP official.
  • Develop a unit operation specific questioner for site visit which shall be later compared with available data of project. In case of any additional survey/investigation are required, our expert will make necessary report for approval of client for undertaking such survey/investigation for reimbursement as per actual cost involved. The working of the STPs shall be reviewed for, but not limited to:
    • Performance of the unit process, working of electrical/mechanical equipment’s
    • Flexibility to absorb fluctuation in loads.
    • Skill level of operation.
    • Replacement of spares and frequency.
    • Brief on energy consumption.
    • Modification/alteration/replacement on a broad scale.
    • Effluent parameters.
  • Review of the existing O&M manual, and suggest brief for proper operation and maintenance of STPs.
  • Prepare/Review of financial aspect including block estimates to provide an idea to client about financial aspect of the project with ultimate aim of the working of the STPs to the desired performance.
  • To prepare an evaluation and recommendation report along with draft TOR for engaging consultancy services for overseeing O&M of STPs for a period of 3 to 5 years.

DPR for 24x7 water supply system,integrated Sewerage System and Storm Water Drainagesystem in Bihar-"Package– 11

Assignment Name:

Preparation of Detailed Project Reports for 24x7 water supply system, integrated Sewerage System and Storm Water Drainage system for 59 towns in Bihar- “Package – 11- Bhagalpur” with BUIDCO

Approx. value of the Work: : INR- 1200 Crores

Duration of Assignment (months): 8 Months

Water Supply: Kahalgaon, Nawgachhia, Sultanganj

Storm Water: Bhagalpur, Banka, Kahalgaon, Nawgachhia, Sultanganj

Sewerage System: Banka

Name of Client: IL&FS Infrastructure Development Corporation

Bihar Urban Infrastructure Development Corporation Ltd.

Start date
September: 2013

Completion date:
Ongoing

Name of senior professional staff of your firm involved and functions performed:

  • Rajiv Mishra-Team Leader cum Public Health Engineering Expert,
  • Deepak Sharma-Water Supply Expert (Deputy Team Leader)
  • Sandeep Gupta- Sewerage Treatment Expert,
  • Subimal Pattdar- Social and Institutional Expert
  • Document controller and coordinator – Nisha Bhatia
  • Chandan Kumar- Engineer

  Water Supply: -
Component - Design & Engineering for DPR

  • Design and Detailed engineering of intake, treatment, tubewell, transmission main and feeder main from the source of supply including identification of source.
  • Design and Detailed Engineering of storage facility consisting of Under Ground Tank, Pump House, Over Head tank including identification of vacant lands in consultation with the Local Body
  • Design and Detailed Engineering of related Electrical, Mechanical and Instrumentation systems.
  • Design and Detailed Engineering of RCC Structures
  • Preparation of detailed working drawings and specifications

  Sewerage System: -
Component - Design & Engineering for DPR

  • Design and Detailed engineering of sewer network, intermediate pump stations, main pumping station, sewage treatment plant and disposal system.
  • Design and Detailed Engineering of related Electrical, Mechanical and Instrumentation systems.
  • Design and costing of SCADA system.
  • Design and Detailed Engineering of RCC Structures
  • Preparation of detailed working drawings and specifications

  Storm Drainage System: -
Component - Design & Engineering for DPR

  • Reviewing existing maps, studies, and other related documentation to obtain a better understanding of the town’s Storm Water Drainage system prior to the start of fieldwork.
  • Understanding of the existing storm drainage system and identifying the main issues including severity and location of inundation, pollution and other environmental issues of the drains, absence of drainage system or lack of connectivity in conveyance, physical constraints to flow in the drains viz. encroachments into Storm Water Drainage channels, solid waste dumping, natural and man-made obstructions, including pipe culverts and low level causeways, road and rail over bridges, flyovers, canals, permanent ways etc.
  • Identifying appropriate planning and design parameters based on the project area situation; mainly, the appropriate design frequencies of the storms (based on degree of protection needed vs. permitted flooding, based on type of area – residential, commercial, business districts etc), the run-off coefficients, proposed method of computation, proposed channel shapes etc.,
  • Utilizing proven and readily available computer dynamic modeling software i.e. sewer cad and water cad, for storm water excel based software (that allows for visually depicting the design changes and their impact), carry out analysis of existing situation of storm water drains to identify deficiencies and develop alternative strategies and options for expansion / augmentation of the existing system to address system deficiencies.
  • While formulating designs, the existing side drains, canals, other major storm water canals / rivers maintained by the PHED Department, Highways Department should be analyzed based on the maximum rainfall and storm water run- off for the project area on a scientific basis. with suggestions for appropriate re-modeling of the existing major storm water canals .
  • Where there is interface between sewerage system and storm water drainage, proposing appropriate plans to remove / reduce the interface; and/or reduce the impact.
  • Based on this analysis, identify the most appropriate alternatives that may include drain improvements, augmentation/extension, flood detention measures, improvements in flood handling equipment/structures, strengthening of existing structures etc. The proposed alternative (which consists various sub-alternatives on major drains / decisions on flood water retention / pumping etc) shall be the economic one amongst the selected alternatives, looking from capital / O&M costs angle; in addition to meeting the planning and design requirements mentioned above.
  • Suggesting suitable materials for construction with cost benefit analysis discussing the feasibility of using pre cast structures and providing structural designs and other design and details as appropriate.

DPR of storm water Services in Itanagar, Arunachal Pradesh

Assignment Name:

Consultancy Work for Preparation of Preliminary Project report, Feasibility Study Report, BOQ and estimation of storm water Services in Itanagar, Arunachal Pradesh

Approx. value of the Work: : INR- 263 Crores

Duration of Assignment (months): 10 Months

Location: Itanagar, Arunachal Pradesh, India

Name of Client: Byucksan India Pvt. Ltd.

Start date
July: 2013

Completion Date:
Completed Oct., 2013

Name of senior professional staff of your firm involved and functions performed:-

  • Mr. Deepak Sharma
  • Mr. Umesh
  • Mr. Chandan Kumar

Scope of Services:-

  • Preparation and submission of Preliminary Project Report,
  • Feasibility Study Report,
  • BOQ and estimation of Strom water Services

Narrative description of Project: -
Inspite of all efforts made in the past, the drainage system of Itanagar happens to be a bottle neck. The local Government has taken up the task in right earnestness for the modification and improvement of the existing drainage system within the areas under their jurisdictions. The task envisages the following aspects.

  • Study of the total drainage area, demarcation of the catchments of the main drains, estimation of the carrying capacities of the drains viz. a viz. against sections provided, encroachments on the drainages.
  • Identification of various drainage zones contributing towards the main drains.
  • Estimation of design flows from each of the drainage zones by adopting appropriate hydrologic design criterion suited for available data.
  • Adoption of appropriate cross sections of the drains keeping in view the future growth patterns.
  • To workout detailed designs, drawings, cost estimates of the existing and proposed drains including the costs towards the desilting

  • The final Detailed Project Report which includes the designs, drawing, bill of quantities and cost has been prepared as per the norms of JNNURM.

Consultancy services for Flow Measurement of Sewerage Pumping Station in Haridwar.

Assignment Name:

Consultancy services for Flow Measurement of Sewerage Pumping Station in Haridwar

Approx. value of the Work: NA

Duration of Assignment (months): 1 Month

Location: Haridwar, Uttar Pradesh India

Name of Client: MWH India Pvt. Ltd.

Start date
September, 2013

Completion Date:
Completed

Name of senior professional staff of your firm involved and functions performed:-

  • Deepak Sharma- Team Leader
  • Rajiv Ranjan- Flow Measurement Expert
  • Chandan Kumar- Engineer

Narrative description of Project: -
Flow Measurement for seven different Sewerage pumping stations and Main pumping stations at Haridwar form different locations and pumping stations. Using ultra sonic flow meters from various 125mm to 75 mm Dia . The capacity of the pumps varies from 1600. To 250LPM. ACEPL was responsible for the flow measurement and pump energy consumption analysis to drive their pumping efficiency. This project was funded by ADB.

Preparation of Detailed Project Report for transportation hub in Rajsamand– Rajasthan

Assignment Name:

Preparation of Detailed Project Report for transportation hub in Rajsamand– Rajasthan.

Approx. value of the Work: INR- 100Crores

Duration of Assignment (months): 3 Month

Location: Rajasthan , India

Name of Client: PDCOR, Jaipur

Start date
June, 2013

Completion Date:
Completed

Name of senior professional staff of your firm involved and functions performed:-

  • Deepak Sharma- Team Leader
  • Rajiv Mishra –Infrastructure expert
  • Chandan Kumar- Engineer

Narrative description of Project: -
ACEPL was responsible for the preparation of DPR for water supply, sewerage, storm water and fire fighting services. The industrial hub was designed for the dairy, transportation and other multi-disciplinary industries proposal.

ACEPL was responsible for the following tasks: -

  • Water demand assessment
  • Storm water calculation
  • Sewerage generation
  • Firefighting design for the external area
  • WTP design
  • STP design on the basic of zero discharge
  • Detailed design for aforesaid work including drawings, BOQ
  • DPR preparation

Nasik Group Housing -Indiabulls

Assignment Name:

Nasik Group Housing

Approx. value of the Work: INR- 90Crores

Duration of Assignment (months): 24 Months

Total area of Project: 35 Acres,
Total Built-up Area : 3.5 Lac Sqft.

Location: Nasik, Maharashtra, India

Name of Client: Indiabulls

Start date
Dec. 2012

Completion Date:
Ongoing

Name of senior professional staff of your firm involved and functions performed:-

  • Mr. Rimpesh Sharma
  • Mr. Deepak Sharma
  • Mr. Hemant Khanna
  • Mr. Sandeep Saini

Narrative description of Project: -
Residential Development for 450 nos. of dwelling units with ancillary supports facilities & amenities i.e. Shopping complex, club, Playschool, Health Center, Transit, Hotel, Bungalows, open play fields, & organized greens.

Scope of Services : -

  • Master Planning,
  • Infrastructure Design
  • Detailed Engineering Services

Amravati Group Housing -Indiabulls

Assignment Name:

Amravati Group Housing

Approx. value of the Work: INR- 100Crores

Duration of Assignment (months): 24 Months

Total area of Project: 60 Acres,
Total Built-up Area : 6.5 Lac Sqft.

Location: Amarawati, Maharashtra, India

Name of Client: Indiabulls

Start date
Dec. 2012

Completion Date:
Ongoing

Name of senior professional staff of your firm involved and functions performed:-

  • Mr. Rimpesh Sharma
  • Mr. Deepak Sharma
  • Mr. Hemant Khanna
  • Mr. Sandeep Saini

Narrative description of Project: -
Residential Development for 450 nos. of dwelling units with ancillary supports facilities & amenities i.e. Shopping complex, club, Playschool, Health Center, Transit, Hotel, Bungalows, open play fields, & organized greens.

Scope of Services : -

  • Master Planning,
  • Infrastructure Design
  • Detailed Engineering Services (External services)

IndiCity - (Group Hosuing Project)

Assignment Name:

IndiCity

Approx. value of the Work: INR- 20 Crores

Duration of Assignment (months): 10 Months

Total area of Project: Mixed-use Development (357.00 acres)
Total Built-up Area : 6.5 Lac Sqft.

Location: Jaipur , Rajasthan , India

Name of Client: Fire Capital with Grass field Fire Limited

Start date
Dec. 2012

Completion Date:
Ongoing

Name of senior professional staff of your firm involved and functions performed:-

  • Mr. Rimpesh Sharma
  • Mr. Deepak Sharma
  • Mr. Hemant Khanna
  • Mr. Sandeep Saini

Narrative description of Project: -
Total land parcel of 351 acres spread along 45 m wide & 08 kms long arterial spine road, with theme development in different land parcels constituting the overall development having main entrance from NH.

Infrastructure planning and design services for w/s. sewerage, road network, and storm water drainage, electrification, telecom and solid waste. These services are provide in two phases:

Phase-1: preliminary design phase, statutory approvals, schematic design and detail budget Phase-2: Design development and detail working drawing, tenders & bid management, negotiation, construction stage, completion stage

Scope of Services : -

  • Infrastructure Design
  • Detailed Engineering Services